Politics & Government

More Gwinnett Road Closure Information

We bring you the update for May 26-June 1.

Courtesy of the Gwinnett Transportation Department, here is the road closure situation for May 26-June 1.

  •  Alcovy Road from Campbell Road to West Drowning Creek Road will require intermittent lane closure through December 2012 for roadway improvements associated with Sugarloaf Parkway extension, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Bramlett Shoals Road from Brooks Road to Bramlett Shoals Road Connector will require intermittent lane closures through July for roadway improvements associated with Sugarloaf Parkway extension, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.

Got any commute tips? Tell us in the comments below.

 

Find out what's happening in Suwaneewith free, real-time updates from Patch.

  • Campbell Road West from Campbell Road to Alcovy Road will require intermittent lane closures through July for roadway improvements associated with Sugarloaf Parkway extension, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Cruse Road from Sweetwater Circle to Club Drive will require intermittent lane closures, and traffic shifts through May 2013 for roadway improvements and bridge replacement, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Fence Road from York View Drive to Little Mulberry River Park will require intermittent lane closure through July for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Grayson New Hope Road at Chandler Road will require intermittent lane closures through September for intersection improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm
  • Highpoint Road 500 feet north of Aspen Circle will close on May 24 through June 30 for culvert replacement.  The detour route will be Highpoint Road to Oak Road to Hewatt Road to Bruckner Boulevard to Highpoint Road and the reverse.  For further information contact the Department of Water Resources at 678.376.6926.
  • Hillside Drive 200 feet east of Lakeview Road will close on May 29 through June 25 for culvert replacement.  The detour route will be Hillside Drive to Grayson Highway/SR 20 to Webb Gin House Road to Scenic Highway to Pharr Road to Hillside Drive and the reverse. For further information contact the Department of Water Resources at 678.376.6926. 
  • Interstate 85 at Indian Trail Road will require intermittent lane closures May 29, 2012 through June 1, 2012 for bridge work, weather permitting. Lanes closed will be as follows: May 29th – I-85 Northbound two outside lanes, May 30th –I-85 Northbound two inside lanes, May 31st – I-85 Southbound two inside lanes, June 1st –I-85 Southbound two outside lanes. Lane closures will be from 9:00pm to 5:00am.
  • Indian Trail Road from Beaver Ruin Road to Oakbrook Parkway will require intermittent nightly lane closures beginning April 16 through June 8 for paving  and median installation , weather permitting. The closures Sunday through Thursday will be from 8:00 pm to 6:00 am, and Fridays from 9:00 pm to 8:00 am.
  • Indian Trail Road from Beaver Ruin Road to Oakbrook Parkway will require intermittent lane closures through August for roadway improvements, and median installation, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Jimmy Carter Boulevard at North Norcross Tucker Road will require intermittent lane closures through June for roadway improvements and paving operations, weather permitting. Any such closures will be between the hours of 9:00am to 4:00pm, and 9:00pm to 5:00am.
  • Johnson Road between Settle Bridge Road and Suwanee Dam Road will require intermittent lane closures through July for pedestrian improvements, weather permitting.  Any such closures will be between the hours of 9:00 am and 4:00 pm.
  • Johnson Road at US 29/Lawrenceville Highway will require intermittent lane closures through July for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Killian Hill Road from Stonemont Drive to Pathfinder Way will require intermittent lane closures, and traffic shifts through September for bridge replacement and roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Lee Road over No Business Creek will require intermittent lane closures and traffic shifts through June for bridge replacement, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Level Creek Road from Glen Level Drive to Cabot Creek Way will close on May 29 through June 25 for drainage improvements.  The detour route will be Level Creek Road to Spring Hill Drive to Peachtree Industrial         Boulevard to West Price Road to Level Creek Road and the reverse.  For further information contact the Department of Water Resources at 678.376.6983.                       
  • Martins Chapel Road from Bramlett Shoals Road to Bramlett Shoals Connector will require intermittent lane closures through July for roadway improvements associated with Sugarloaf Parkway extension, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Meadowbrook Drive from Dogwood Way to Mark Trail will close April 24 through end of May for drainage improvements.  The detour route will be Meadowbrook Drive to Jimmy Carter Boulevard to Rockbridge Road to Meadowbrook Drive and the reverse.  For further information contact the Department of Water Resources at 678.376.6983.
  • Miller Road from Cole Drive to Hambrick Drive will require intermittent lane closures through July for sidewalk improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.      
  • New Hope Road from Country Acres Lane to Ivy Lea Drive SE will require intermittent lane closures, and traffic shifts through July for roadway improvements and intersection alignments, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm. 
  • New Hope Road from Tribble Mill Parkway to Callie Still Road will require intermittent lane closures through September for pedestrian improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • North Berkeley Lake Road from Bush Road to Lakeshore Drive will close on March 19, 2012 through February 2013 for Berkeley Lake Dam repairs.  The detour route will be North Berkeley Lake Road to Peachtree Industrial Boulevard to South Berkeley Lake Road to North Berkeley Lake Road and the reverse.
  • North Norcross Tucker Road at Western Hills Drive will close May 30 until May 31 for drainage improvements.  The detour route will be North Norcross Tucker Road to Buford Highway to Jimmy Carter Boulevard to North Norcross Tucker Road and the reverse.  For further information contact the Department of Water Resources at 678.376.7000.
  • North Norcross Tucker Road from Western Hills Drive to Pelican Drive will require intermittent lane closures through July for roadway widening and intersection improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Old Norcross Tucker Road from Britt Road to South Norcross Tucker Road will require intermittent lane closures through November for roadway improvements, weather permitting.  Any such closures will be between the hours of 9:00am and 4:00pm.
  • Old Peachtree Road 500 feet east of Cedar Drive to Friars Gate Drive will close June 4 through June 23 for culvert improvements.  The detour route will be Old Peachtree Road to Tech Center Parkway to Buford Drive to Old Peachtree Road and the reverse.  For further information contact the Department of Water Resources at 678.376.6983.  
  • Old Peachtree Road at Sunny Hill Road will require intermittent lane closures through June for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Peachtree Industrial Boulevard from Pleasant Hill Road to Summer Chase Drive will require intermittent lane closures through July for multi-use path construction and roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Pleasant Hill Road from McClure Bridge Road/Howell Ferry Road to US 23/Buford Highway will require intermittent lane closures through July 2013 for road widening and improvements, weather permitting. Any such closures will be between the hours of 9:00am and 5:00pm.
  • Pleasant Hill Road from Club Drive to Breckinridge Boulevard will require intermittent lane closures through September for pedestrian and streetscape improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Pleasant Hill Road from US 23/Buford Highway to US 29/Lawrenceville Highway will require intermittent lane closures through October for ATMS improvements, weather permitting.  Any such closures will be between the hours of 9:00am and 4:00pm.
  • Pleasant Hill Road from Venture Parkway to Satellite Boulevard will require intermittent lane closures through October for pedestrian improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Rabbit Hill Road from Hurricane Shoals Road to Rabbit Hill Park entrance will close on June 4 for one month for intersection improvements. The detour route will be Rabbit Hill Road to Hurricane Shoals Road to Old Peachtree Road to Dacula Road to Fence Road to Rabbit Hill Road and the reverse. For further information contact the Department of Community Services at 770.822.8829.
  • Ridge Drive from Satellite Boulevard and Woodward Mill Road will close until further notice.
  • Rock Springs Road from Bluffton Road to Pine Log Way will require intermittent lane closures, and traffic shifts through August for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Rockbridge Road from Stovall Road to Lilburn Stone Mountain Road will require intermittent lane closures through August for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am 4:00pm.
  • Satellite Boulevard from Old Norcross Road to Tandy Key Lane will require intermittent lane closures through August for pedestrian and streetscape improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm
  • SR 20/Nelson Brogdon Blvd/Buford Drive from Peachtree Industrial Boulevard to I-985 will require intermittent lane closures through October for ATMS improvements, weather permitting.  Any such closures will be between the hours of 9:00am and 4:00pm.
  • SR 316/University Parkway from Boggs Road to Sugarloaf Parkway will require intermittent single lane closures and pacing through September for roadway widening and improvements, weather permitting. The daytime single lane closures and pacing will be between 10:00am to 3:00pm Monday through Friday. Nighttime single lane closures will be from 9:00pm to 5:00am, 7 days a week.
  • SR 316/University Parkway from Winder Highway to Harbins Road will require intermittent lane closures through December 2012 for roadway improvements associated with Sugarloaf Parkway extension, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • South Harris Street from the intersection of Buford Highway westerly 300 feet will permanently close.  For further information contact the City of Buford at 770.945.6761.
  • Sugarloaf Parkway at SR 124/Scenic Highway will require intermittent lane closures for four weeks road improvements, weather permitting.  Any such closures will be between the hours of 9:00am and 4:00pm.
  • Sugarloaf Parkway from the Gwinnett Arena to North Brown Road will require intermittent lane closures through July for pedestrian improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • Temple Johnson Road 500 feet north of Windlake Drive will close on May 29 through June 25 for culvert replacement.  The detour route will be Temple Johnson Road to Pate Road to Lenora Church Road to Temple Johnson Road and the reverse.  For further information contact the Department of Water Resources at 678.376.6983.                                                                                                       
  • Temple Johnson Road from Skyland Drive to Preserve Creek Way will require intermittent lane closures through July for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • US 29/Lawrenceville Highway from Lawrenceville Suwanee Road to Sterling Hill Road will require intermittent lane closures through July for roadway improvements, weather permitting. Any such closures will be between the hours of 9:00am and 4:00pm.
  • West Campbell Road closed permanently due to Sugarloaf Parkway extension.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here

More from Suwanee